Home ProductsFiber Mixing Machine

CE 800kg/h Nonwoven Cotton Fiber Mixing Machine

Certification
China CHANGSHU HONGYI NONWOVEN MACHINERY CO., LTD certification
China CHANGSHU HONGYI NONWOVEN MACHINERY CO., LTD certification
I'm Online Chat Now

CE 800kg/h Nonwoven Cotton Fiber Mixing Machine

CE 800kg/h Nonwoven Cotton Fiber Mixing Machine
CE 800kg/h Nonwoven Cotton Fiber Mixing Machine CE 800kg/h Nonwoven Cotton Fiber Mixing Machine CE 800kg/h Nonwoven Cotton Fiber Mixing Machine

Large Image :  CE 800kg/h Nonwoven Cotton Fiber Mixing Machine

Product Details:
Place of Origin: China
Brand Name: HONGYI
Certification: ISO9001, CE
Model Number: HYDC
Payment & Shipping Terms:
Minimum Order Quantity: 2sets
Price: negotitable
Packaging Details: PE film
Delivery Time: 30 days.
Payment Terms: L/C, T/T
Supply Ability: 5 sets per month.

CE 800kg/h Nonwoven Cotton Fiber Mixing Machine

Description
Weight: Customization Certification: CE Certificate
Raw Material: Polyester Fiber, Wool, Cotton, Etc. Color: Customized
Capacity: 250kg/h-800kg/h Warranty: 1 Year
Volume: 16m3-30m3
High Light:

CE Fiber Mixing Machine

,

800kg/h Fiber Mixing Machine

,

16m3 non woven fabric machine

Nonwoven Raw Cotton Fiber Blender Raw Cotton Fiber Mixing Machine

 

Functionality & application:
1. Using the hot-air through process to heat the fiber web for bonding and drying purpose.
2. Applicable for producing mattress pad, wadding & fiberfill, diverse insulation pad, etc.

Features:
1. Efficient air heating ducts inside with circular air flow achieving the high efficient and uniform heating.
2. Automatic and precise temperature control
3. Multiple thermal insulation design benefits the energy saving
4. Optional heating methods: burner, boiler, electrical heating.
5. Accessible design for easy cleaning and maintenance

 

Technical parameters:

Working width 1400mm, 1700mm, 2500mm
Storage volume 16m3-30m3
Capacity 300kg/h, 500kg/h, 800kg/h
Installed power 8.8Kw

 

Trade information:

Trade terms FOB, CNF, or CIF
Lead time 90 days after deposit.
Payment terms 30% advance payment, 70% paid off before delivery.
Warranty twelve (12) months after mechanical and electrical commissioning.
After-sale service

The seller is responsible for installation and debugging. The buyer is responsible for the round-trip airplane tickets, accommodation, medical treatment, safety and relative fees. In addition the buyers should assign translator, workers, electrical cable (from machines to control panel and from power to control panel) and tools for installation to cooperate with the work. Installation cost is USD180/Day/engineer and totally installation period is about 30-40 days depending on well cooperation of the buyer.

 

Contact Details
CHANGSHU HONGYI NONWOVEN MACHINERY CO., LTD

Contact Person: admin

Send your inquiry directly to us (0 / 3000)