PRODUCT

PRODUCT

产品中心

High Capacity Non Woven Fiber Mixing Machine 1500mm

Product description

1. This machine is designing for mix two kinds of different materials proportionally. 2. Automatically adjust the ratio of the two materials, then mix them together, in order to get desired effect.

Product Details


Product Details:

Place of Origin: China
Brand Name: HONGYI
Certification: ISO9001, CE
Model Number: HYDC

Payment & Shipping Terms:

Minimum Order Quantity: 2sets
Price: negotitable
Packaging Details: PE film
Delivery Time: 30 days.
Payment Terms: L/C, T/T
Supply Ability: 5 sets per month.

High Capacity Non Woven Fiber Mixing Machine 1500mm

Description


Working Width: 1500 Technology: PLC
Raw Material: Polyester Fiber, Wool, Cotton, Etc. Color: Customized
Capacity: 250kg/h-800kg/h Warranty: 1 Year
Volume: 16m3-30m3
High Light:

1500mm Fiber Mixing Machine

,

HONGYI Fiber Mixing Machine

,

OEM nonwoven making machine

 

HIgh Capacity Non-Woven Fiber Mixing Blending Machine

 

1. This machine is designing for mix two kinds of different materials proportionally.

2. Automatically adjust the ratio of the two materials, then mix them together, in order to get desired effect.

3. Usually work with two filling machines.

4. With automatical weighting system.

 

Features:

1. Photoelectric control during the production process.

2. Fiber density spreads even.

3. The stripper and evener roller are in the independent transmission. This will be with high dependability, easy adjustment and maintenance.

4. The spike lattice with the machine behind control the feeding by Photoelectric to make the blending evener.

 

Technical parameters:

Working width 1400mm, 1700mm, 2500mm
Storage volume 16m3-30m3
Capacity 300kg/h, 500kg/h, 800kg/h
Installed power 8.8Kw

 

Trade information:

Trade terms FOB, CNF, or CIF
Lead time 90 days after deposit.
Payment terms 30% advance payment, 70% paid off before delivery.
Warranty twelve (12) months after mechanical and electrical commissioning.
After-sale service

The seller is responsible for installation and debugging. The buyer is responsible for the round-trip airplane tickets, accommodation, medical treatment, safety and relative fees. In addition the buyers should assign translator, workers, electrical cable (from machines to control panel and from power to control panel) and tools for installation to cooperate with the work. Installation cost is USD180/Day/engineer and totally installation period is about 30-40 days depending on well cooperation of the buyer.

11

Key words:

Online Inquiry

Submit an inquiry